Add a Drawing Set

Previous TopicNext TopicContents

The Drawing Sets log contains information for each drawing set in the project. This information includes the name of the set, ball in court, progress, phase, and priority.

To add a new Drawing Set:

  1. Expand the Logs folder and click Drawing Sets to open the Drawing Sets Log Window.
  2. Click Add Document to open a new Drawing Set Document Window.

On the General tab:

  1. Enter a name and title for the drawing set.
  2. Click Select Date , and choose a date for the set.
  3. If there is a bid package for the project, use the Latest Bid Package drop-down list to choose the package.

On the Status tab:

  1. Click Select next to the Ball in Court field to choose the Ball in Court contact.
  2. Use the Priority drop-down list to choose the priority (High, Medium, or Low). This will appear in the BIC’s Action List.
  3. If applicable, use the Phase drop-down list to choose the phase to which the drawing set applies.
  4. If applicable, enter the percent of progress on the drawing set in the Progress field.

On the Drawing in this Set tab:

On the Distributed To tab:

On the Issues tab:

To link an issue to the equipment, click Link to open the Select Issue Dialog Box, and select the issue.

On the Attachments tab:

Save the Drawing Sets document:

Click Save and Close when finished.