Add Scope Item Dialog Box


A scope item is a subset of a procurement item. Once you create a procurement item for bid, you can break it down into subsections to detail exactly what is needed. Use this dialog box to add scope items to the currently open procurement item. You can further define scope items into sub-items, and detail items below the sub-items.

Cost Code

The cost code to which this scope item applies.

Title

The name of the item.

Scope Item Cost:

Quantity

The number of items required.

U of M

The unit of measurement, if applicable.

Unit Price

The price per unit for the item.

Total Cost

The sum of all items in this document.

Sub Items

Use this section to add sub-items to the scope item, and detail items to sub items.

Note: Press F8 to add detail items to the sub-items. (Detail items do not have spec sections.)

Add Sub Item

Click to add a row to enter details on sub-items that are required as part of this scope item.

Re-Sync

Click to recalculate the values in the Total column, to make the values at the top level equal the values entered in the sub-levels.

Clicking Re-Sync "rolls up" the values from the sub-levels and recalculates the top level values. This is beneficial in instances where the top-level values were entered before the lower values, and may no longer match those values. See Procurement Overview for more information on top-down/bottom-up calculations and re-sync.

Spec Section

Select the specification section to which the sub-item applies.

Title

The name of the item.

Qty

The number of sub-items required.

U of M

The unit of measurement, if applicable.

Unit Price

The price per unit for the item.

Total

The total cost of the sub-item appears in this field.

Comments

Enter any additional comments about the sub-item.

Delete

Click to delete the item.

Comments

Enter any additional details about the scope item.

Sub Items Shortcut keys:

You can use the following keyboard shortcuts in the Sub Items section:

Shortcut Key

Function

Tab, Shift-Tab

Moves to the next/previous item in tab sequence.

F7

Adds a sub-item row to the bottom.

F8

Adds a detail row to the bottom of the detail items of that sub item.

Up/down arrows, Enter/Shift-Enter

Moves up/down in a column.

In a column of hyperlinks, up/down arrows will work to navigate. Enter activates the link.

To move up/down in a column of drop-downs, Enter/Shift-Enter will work to navigate to the next cell; the up/down arrows will scroll through the list of options.

Spacebar

Selects/clears an option.

How to access this dialog box:

  1. Expand the Contract Information folder in the Project View and click Procurement.
  2. From the Procurement Items Log Window, choose a procurement item document.
  3. From a Procurement Item Document Window, click the Bid Tabulation tab.
  4. On the Bid Tabulation tab of the Procurement Item Document Window, click Add (next to Scope Items). This will not display if the procurement item has been awarded.


Legal Notices
Copyright © 2015, Oracle and/or its affiliates. All rights reserved.

Last Published Wednesday, June 17, 2015